What Should You Ask Before a Tub-to-Shower Conversion?
Ask for the specific waterproofing product and how it will be applied, whether prefab or tile suits your situation, whether the existing drain can stay, whether a curbless entry is feasible for your floor structure, where grab bar blocking will go, and exactly what the price includes. On a tub-to-shower conversion, the hidden work decides the outcome, waterproofing above all. Ask before you sign, and you get a leak-free shower that meets your accessibility goals at the price you were quoted.
Prefab or Tile, and Where Does the Plumbing Go?
Which Do You Recommend for My Situation?
Ask which the installer would recommend and why, given your budget, goals, and bathroom. A good one explains the trade-offs — prefab is affordable, fast, low-maintenance, and has fewer leak points, while tile is custom and upscale but requires more upkeep and depends entirely on the waterproofing — and then recommends what fits you rather than defaulting to the pricier option. A revealing follow-up is what they would choose for their own home in your circumstances. An installer who can explain why a quality prefab unit might serve you better than tile, instead of steering automatically toward the larger job, is showing candor that tends to carry through the rest of the project.
Can We Keep the Plumbing Where It Is?
Ask whether the shower can use the existing drain location or whether the plumbing has to move. Moving a drain, especially through a slab, adds significant cost, so an installer who designs around the existing location where feasible saves you money. Note whether they check first whether you are on a slab or over a crawlspace — that is where the real money in your particular conversion sits, and a cost-conscious installer raises it proactively. (For more on this, see Hidden Costs of a Tub-to-Shower Conversion.)
Where Exactly Will the Drain Go?
For a prefab shower in the existing tub footprint, the drain typically stays where the tub drain was. For a custom shower, confirm the drain location before tile installation begins, because moving a drain after tile is set is expensive and destructive. A linear drain at the shower entry is the most accessible configuration for aging in place; a center drain is the most common default. Get the location on paper in a simple drawing before work starts.
What Waterproofing System Will You Use?
This is the critical question, especially for tile. Ask for the specific product name and the application method, and listen for a real answer.
Acceptable: “We use Schluter Kerdi membrane applied to the cement board with Kerdi-Band at corners and seams, and allow 48 hours to cure before tiling.” Or: “We apply two coats of Laticrete Hydro Ban and allow it to cure per manufacturer specifications.”
Not acceptable: “We use cement board” — cement board alone is not waterproof in wet areas. Or “we use the standard waterproofing,” which commits to nothing.
For tile, what you want to hear is a bonded membrane system over the substrate with sealed seams and proper pan construction, since tile and grout are not themselves waterproof. For a prefab unit, it is correctly sealed perimeter joints. Vagueness here is a serious red flag: every tile and grout joint above the membrane depends on it, and poor waterproofing causes leaks and structural damage.
Accessibility: Curbless Entry and Grab Bar Blocking
Is a Curbless Entry Feasible for My Bathroom?
Ask what is involved in creating a curbless entry given your floor structure and existing drain location. The contractor should assess the subfloor depth, since curbless conversions sometimes require lowering the drain, which may mean cutting into the floor or building up the surrounding bathroom floor. They should also address the floor transition — the curbless shower floor must be continuous with or slightly below the adjacent bathroom floor — and confirm drain relocation is feasible. (For more on this, see How to Find the Best Tub-to-Shower Conversion Contractor.)
Not every bathroom can accommodate a curbless shower without significant subfloor modification. A contractor who immediately says “no problem” without assessing the floor structure has probably not considered all the factors. Fluency in how they slope the floor to drain and recess the subfloor or slab is the most reliable indicator that an installer has genuinely built accessible showers before. (For more on this, see How to Find the Best Tub-to-Shower Conversion Installer.)
Where Will the Grab Bar Blocking Go?
Specify this before construction begins. Blocking should be installed in the shower walls during the framing phase, before cement board and waterproofing go on, at grab bar height ranges: 33 to 36 inches on the wall beside the bench or seat, and 48 to 60 inches on the wall at the shower entry. Adding blocking later means opening the walls and destroying the tile work.
Ask specifically how grab bars will be anchored — into studs or added blocking, never into drywall alone. A contractor who includes blocking in the conversion scope as standard practice is applying the highest quality standard for aging in place. While you are on the subject, ask about a bench and slip-resistant flooring. The CDC’s STEADI initiative treats home modification as a core part of reducing fall risk for older adults.
What Is Included, and What Happens If You Find Damage?
Ask for the complete inclusion list in writing before signing. It should cover:
- Demo and disposal of the existing tub.
- Substrate (cement board or uncoupling membrane).
- Waterproofing membrane.
- Shower pan or mortar bed.
- Tile and grout, or the prefab surround.
- Plumbing connections including valve, drain, and showerhead.
- Shower door or curtain.
- Permit.
- Final caulking and cleanup.
Anything not on that list is a potential add-on mid-project. Ask for the all-in price and the timeline, including how long the bathroom will be out of use, and have the installer itemize the parts most prone to becoming surprises — drain relocation, waterproofing, potential repairs, and accessibility features — so you are comparing complete projects rather than headline numbers.
Then ask how they handle hidden damage found during demolition: water damage, rot, or plumbing problems behind the tub. The reassuring answer is a clear process rather than a promise of no problems — that they will stop, show you what they found, and quote the repair before proceeding, and that a contingency is standard practice. An installer who claims demolition never turns up surprises is either inexperienced or not being straight with you.
Before You Sign
Get at least two or three quotes from licensed, insured, local contractors. Multiple quotes reveal the market rate, expose scope differences between bidders, and let you judge communication quality before committing. The lowest bid is not the best value if the scope is thin or the materials are underspecified. Verify current general liability insurance and workers compensation coverage before work starts.
Put the scope in writing — materials, labor scope, timeline, permits, cleanup, disposal, and warranty terms. For any project over $500, written scope is non-negotiable. Tie payments to milestones: a deposit at signing, a payment at material delivery or project start, and final payment at completion after a walkthrough. A contractor who requires full payment before work begins is a red flag in any trade.
Ranges here are national ballpark figures, not quotes. Actual pricing varies by region, home condition, materials, and contractor. How we source cost data.
Frequently Asked Questions
The specific waterproofing product and application method, whether prefab or tile suits your situation, whether the existing drain can stay in place, whether a curbless entry is feasible for your floor structure, the grab bar blocking scope, and the complete inclusion list covering demo, substrate, waterproofing, tile, plumbing, door, and permit.
How they will handle the waterproofing, especially for tile. You want to hear a bonded membrane system over the substrate with sealed seams and proper pan construction, since tile and grout are not waterproof, or correctly sealed perimeter joints for a prefab unit. Vagueness here is a serious red flag.
Schluter Kerdi is a proprietary waterproofing system: a polyethylene fabric membrane with polypropylene fleece on both sides that bonds to the cement board and to the tile mortar, creating a continuous waterproof barrier without gaps. It costs more than liquid-applied membranes but delivers a more consistent barrier when correctly installed, and it has a long residential track record.
Yes. Moving the drain, especially through a slab, adds significant cost, so an installer who designs around the existing drain location where feasible saves you money. A cost-conscious installer raises this proactively and checks whether you are on a slab or over a crawlspace before promising a drain location.
Yes, and it must be specified before construction begins. Blocking goes into the shower walls before cement board and waterproofing, at 33 to 36 inches on the wall beside the bench or seat and 48 to 60 inches on the wall at the shower entry. Adding it later means opening the walls and destroying the tile work.
A properly waterproofed tile shower lasts 15 to 25 years or longer before significant maintenance. Re-sealing sanded grout every 1 to 3 years and touching up caulk at the joints every 3 to 5 years extends that. A shower with inadequate waterproofing starts showing grout cracking, loose tile, and mold within 3 to 7 years.
Yes. A standard 60 by 30-inch tub alcove converts to a 36 by 60-inch walk-in shower with room for a bench, grab bars, and independent bathing. The alcove dimensions stay the same; only the tub, surround, and fixtures are replaced, and the result is significantly more accessible than the tub it replaces.
Ask how they handle water damage, rot, or plumbing problems found during demolition. The right answer is a process, not a promise: they stop, show you what they found, and quote the repair before proceeding, and they treat a contingency as standard practice.